Russian Railways is extending railway to the new terminals at Sheremetyevo Airport

Posted on in News

Sheremetyevo

RUSSIA: Russian Railways are building a railway line Sheremetyevo Airport's new the Northern Terminal Complex (NTC). The new railway line will connect Terminal B and Terminal C, which are currently being built. The project is carried out as part of the Russian Railways investment programme and will increase the airport's accessibility and reduce congestion on the road network.

The project is planned to be implemented in two stages. The first stage involves the construction of the Sheremetyevo-1 station in the NTC and a single-track branch that will connect the new station with the existing Sheremetyevo-2 station located in the South terminal Complex (STC, Terminals D, E and F). This will allow to operate a train shuttle between North and South Terminal Complexes with 15 minutes intervals. The delivery of phase one is estimated to be completed in 2022.

The second stage of the project involved a construction of a two-way connecting line from the Sheremetyevo-1 station with the existing routes of the Moscow railway.