Tender for Clark Airport rail link issued

Posted on in News

Manila Rail

PHILIPPINES: Philippines’ Department of Transport has launched invitation for bids for three civil works packages on Malolos-Clark railway project, linking Metro Manila and Clark International Airport.

The 53km line will have 7 elevated stations and the total value of the project is USD 3.2 billion.

The bid submission deadline is 10 May 2019.

The first package includes a 17-km railway viaduct and two stations, the second one - a viaduct with a length of 16 km, including one station, and the third one, includes a 12-km railway viaduct and two stations.

The bidding documents have been prepared separately for each package and shall be bid as separate contracts.

The project is estimated to be completed at the end of 2023.

The bid documents can be accessed here >>>

The Department for Transport has also broke ground of the Phase 1 of the North-South Commuter Railway (NSCR) Project on 15 February 2019.

NR Clark Phase 1, a 37.6-kilometer mass railway transportation project ,will have a total of ten stations, namely, Tutuban, Solis, Caloocan, Valenzuela, Meycauayan, Marilao, Bocaue, Balagtas, Guiguinto, and Malolos station; and will house a depot at a 14-hectare lot in Valenzuela City.

Once completed, this project will reduce travel time between Manila and Bulacan from 1hr45min to just 35 minutes, serving approximately over 300,000 passengers daily.

The 147-kilometer NSCR Project estimated to cost around PHP777.55 billion will have 36 stations from Clark International Airport to Calamba, Laguna.

The railway project will connect PNR Clark Phase 1 (Tutuban-Malolos) PNR Clark Phase 2 (Malolos-Clark) and the PNR Calamba Project which will run from Manila to Calamba.

The NSCR System will also link with existing railway lines LRT-1, LRT-2, MRT-3 and the Metro Manila Subway.

After signing the contract with Sumitomo Mitsui Construction on 23 January 2019, advance works already began to make way for full construction.